Deliverables

  • D1.1. Project management. Document describing all the management, administrative and quality assurance procedures to be used throughout the project lifecycle and the detailed project plan.
  • D1.2. Periodic and Financial Project Reports. The reports will have the same structure and will include: update on the project status; consolidation of previous reports; level of completion of work; outcome from EC external reviews, recommendations and requests; recommendations from external Committees; risks’ assessment; study of opportunities; foreseen actions for next period; cost report; dissemination and exploitation report; etc.
  • D1.3. Periodic and Final Financial reports. The reports will have the same structure and will include: update on the project financial status; consolidation of previous reports; outcome from EC external reviews, recommendations and requests; cost report; financial risks’ assessment; audit reports; etc.
  • D1.4. Quality & Risk management report. It will provide an update on the project status in terms of Quality and Risk Management and will include: a report on Quality Control focused on monitoring specific project results to determine if they comply with relevant quality standards/guidelines that were required in the Project Management Plan; and a report on Risk Control focused on monitoring all those risks identified and the associated contingency plans defined.
  • D1.5. Data Management Plan. It describes the data management life cycle for the data to be collected, processed and/or generated within the project. It will include information on the handling of research data during and after the end of the project, what data will be collected, processed and/or generated, which methodology and standards will be applied, and whether data will be shared/made open access and how data will be curated and preserved.
  • D2.1. Design of UTM Concept of Operations. Document describing the detailed UTM system operational concept. A preliminary version of this deliverable will be released in M6 to be discussed in the first biannual progress meeting and Advisory Board workshop. 
  • D2.2. Definition of UTM Scenarios and use cases report.  Report with detailed description of relevant UTM scenarios.
  • D2.3. Compilation of UTM performance requirements. Document that lists all performance requirements derived from UTM concept of operations and scenarios.
  • D2.4. Legal and ethical requirements and compliance report. Document enumerating potential legal and ethical requirements and compliance measures to take.
  • D3.1. Analysis of RPAS dynamics, operational requisites and avionics systems. Document with collection of technical and regulation requirements.
  • D3.2. Design of integral RPAS positioning and orientation solution. Report which shows design specifications of Positioning and orientation module according to the design specifications; it will rely on the fusion of data from on-board sensors together with raw measurements coming from the GNSS/EGNOS localization unit.
  • D3.3. Prototype of integral RPAS positioning and orientation solution. Report which shows design specifications prototype specifications of positioning and orientation module.
  • D3.4. Unitary tests report RPAS. Report with the unitary test results; it will include a preliminary integration with the UTM developed in WP5 and a list of failure modes will also be generated.
  • D4.1 Report on EGNSS security-enabling features relevant for RPAS. Report including the initial situation risk assessment and identified important tangible and intangible assets to be protected the possible threats, and vulnerabilities.
  • D4.2. EGNSS security solutions design. Document including all design details for each of the security solutions.
  • D4.3. Security mitigation measures design. Document specifying all mitigation measures/manoeuvres in case an attack is detected.
  • D4.4. Prototype of EGNSS security solutions. Fully functional prototype of GAUSS GNSS integrity and security solution and detailed specifications report.
  • D4.5. Unitary tests report EGNSS. This deliverable will present the results of unitary tests.
  • D5.1. Architecture for UTM infrastructure. This deliverable presents the designed architecture, infrastructure and technologies designed.
  • D5.2. Prototype of ADS-B system. This deliverable consists of a functional automatic surveillance broadcast system for UAS and a report describing its design and development.
  • D5.3. Safe operation methods and tools. This deliverable will consist of a functional solution for UTM trajectory generation and validation as well as cooperative Detect & Avoid and emergencies management. It will include a report describing its design and development.
  • D5.4. Prototype of security system for UTM communications. Prototype consisting on a FPGA based solution to encrypt all system communications in real time. It will include a report describing its design and specifications.
  • D5.5. UTM technologies tests report. This deliverable will present the results of the validation activities performed in the unitary tests.
  • D6.1. Integration and experimental methodology plan. Document containing the system integration plan and the experimental methodology plan were experimental requirements, metrics, setup, ground-truth measurements and results assessment methodology are included.
  • D6.2. Integrated prototype. Functional integrated GAUSS prototype and report describing integration details.
  • D6.3. Integrated functional tests report. Report with integrated test results.
  • D6.4. First trials results report. Report with the first trials campaign summary of events, results and lessons learnt.
  • D6.5. Second trials results report. Report with the second trials campaign summary of events, results and lessons learnt.
  • D6.6. Performance results analysis and conclusions. Detailed report which summarizes the results of the GAUSS system validation, including: comparison of results against ground-truth measurements, residual risk assessment and evaluation of objectives KPI. This report will include also recommendations in terms of methodology, future regulation and standards.
  • D7.1. Dissemination, Communication and Data Management Plan. This deliverable shall describe the GAUSS dissemination strategy and planned activity in a comprehensive manner. It will include goals, objectives, stakeholders , content, communication channels , tools , opportunities, timetable and metrics of dissemination activity. Also a preliminary data management plan will be included.
  • D7.2 Periodic and Final Reports on Dissemination and Exploitation Activities. Document reporting all dissemination and exploitation activities performed under the scope of the GAUSS project.
  • D7.3. Preliminary and final exploitation and business plan. Document providing all details of the GAUSS projects business goals and plans for reaching them in order to ensure that the commercial potential of the GAUSS solution is confirmed and the product enters successfully in the UAS and UTM market.